Common place and typical
Two (2No.) heating boilers, maybe a domestic hot water cylinder or a direct gas fired hot water generator. A run and standby set of central heating circulating pumps and domestic hot water circulating pumps. |
|
|
OCS Concept Range
The Control Concept Range evolved as a practical and cost effective alternative to the convention of supplying a ‘one off’ centralised control panel, traditionally deemed necessary to incorporate all the ancillary electrical components, ie: D.O.L. starters, lamps, switches, fuses, etc. The concept embraces the principle of distributed control technology. Controller, boilers, pumps etc. are connected through interface relays capable of connections from all other ancillary safety or other devices which may be necessary for overall plant control. |
Control Panel
The ‘OCS’ unit incorporates the compensator/optmiser controller and boiler status indicators. Boiler sequence changeover is automatic and can be set to a 7 day or 24 hour changeover mode. The OCS unit will house an automatic temperature control system, incorporating the latest innovations for modern compensator/optimiser units, boiler sequence facility, pump overun, frost protection and other energy saving and service functions. |
|
| |
|
Circulating Pump
The plant circulating pumps will be controlled by a run and standby D.O.L. starter set mounted adjacent, having a main isolator , pump selector switch and pump run and trip indicator lamps. This unit incorporates automatic pump changeover to the standby pump on a run pump ‘trip’ fault. Changeover from No.1 to No.2 pump will also occur automatically, set for 7 days or 24 hours. |
|
| |
Compensator/Optimiser Controllers
We currently supply the Honeywell 'Smile' controller as the prime drive for OCS control concept solutions. This unit offers multiple choices and plant arrangements enabling operation of up to 3 No. heating zones and domestic hot water services incorporating also Solar Heat Source control. |
|
| |
Advantages
* The OCS Concept can be applied to any single or dual boiler installation. * Absolutely no need for a ‘one off’ manufactured control panel for the boiler plant and the necessary panel specific wiring diagrams which are always required, and which are sadly all too often misplaced and unavailable for service purposes in future years. * All OCS schemes are supplied with standard. easy to follow wiring details. * Controller manufactured by a leading manufacturer of control system components. * Any OCS unit supplied in 21 days. 4-6 weeks delivery will be a thing of the past. * Help line to assist in application and installation advice. We can advise on boiler control circuit connections on any boiler, given the boiler wiring details. * All boiler plant supplied from its own dedicated MCB consumer unit. * End User friendly instructions. *
|
|
| |
|
|
|